Corte Madera → Fort Ross & Stewart’s Point

One real group ride, start to finish, in the order a ride leader actually builds it. Every screen below is a capture of this ride — nothing staged, nothing mocked up. 210.6 mi · 6 stops · twisty pace · 5h 46m riding · 9:00 AM to 5:06 PM.

“Head up to Fort Ross, Stewart’s Point, and don’t forget Joy Rd and the dirt roads up in the greater fort ross area.” — the request that produced everything below.

It started with one sentence

Route Architect
The request, and the itinerary it produced — stops with times, roles and reasoning, then road intelligence for each leg.

Then it becomes a real line on real roads

Route
The matched route with its shaping points — the minimum needed to hold the intended shape.

The ride gets checked before you commit to it

Plan
Stops, ETAs and dwell, with the one finding this ride raised — FIRE at mile 173.1, about 4 mi off route.

You leave with the packet, not a screenshot

Leader briefing
The co-leader view end to end — key stops, map, weather and AQI per stop, backup fuel, roster, downloads.
Roadbook
A mile-ordered cue sheet with tulip turn glyphs, and a Street View link at each decision point.

Your riders just get a link

Rider page
What a rider opens from the share link — map, key stops, ETAs, weather, and RSVP. No PII, no account.

And on the day, it comes with you

Ride Mode riding
Miles to the next cue, its tulip glyph and the road it puts you on, and the one after it.
Ride Mode stop view
The cue list with live position, next fuel, backup-fuel gaps, and pace against the plan.

See what it does · Sign in